94 lines
3.2 KiB
Markdown
94 lines
3.2 KiB
Markdown
# PlotDirector Development Deployment
|
|
|
|
Read this document only when deployment or detailed development-service operation is part of the task.
|
|
|
|
## Environment
|
|
|
|
- Development host: Atlas.
|
|
- Repository: `/srv/repos/PlotDirector`.
|
|
- Development files: `/srv/apps/plotdirector-dev/current`.
|
|
- Release archive: `/srv/apps/plotdirector-dev/releases/`.
|
|
- Service: `plotdirector-dev`.
|
|
- Service user: `plotdirector:plotdirector`.
|
|
- Environment file: `/etc/plotdirector/plotdirector.env`.
|
|
- Persistent uploads: `/srv/apps/plotdirector-dev/uploads`.
|
|
- Default deployed data-protection keys: `/srv/apps/plotdirector-dev/App_Data/DataProtectionKeys`.
|
|
- Local endpoint: `http://127.0.0.1:5050`.
|
|
- Public development endpoint: `https://dev.plotdirector.com/`.
|
|
|
|
`current` is a physical directory, not a symlink.
|
|
|
|
Use `sudo -n` for protected service/configuration paths where appropriate.
|
|
|
|
## Before Deployment
|
|
|
|
Confirm the intended commit:
|
|
|
|
git status --short --branch
|
|
git log -1 --oneline
|
|
|
|
If the change involves database migration, apply and verify required SQL before deploying dependent code.
|
|
|
|
Before stopping the service, confirm there is no active import, Story Intelligence run, synthesis or character enrichment work. Check queued and processing work as well as core imports.
|
|
|
|
Do not deploy while such work is active unless interruption has explicitly been accepted.
|
|
|
|
## Publish
|
|
|
|
Use a fresh temporary publish directory. Set fail-fast shell behaviour and derive a release name from the short commit SHA and UTC timestamp.
|
|
|
|
Publish with:
|
|
|
|
dotnet publish PlotLine/PlotLine.csproj -c Release -o "$publish_dir"
|
|
|
|
The standard paths are:
|
|
|
|
release_dir="/srv/apps/plotdirector-dev/releases/$release"
|
|
backup_dir="/srv/apps/plotdirector-dev/current-before-$release"
|
|
|
|
## Install
|
|
|
|
Copy the fresh publish into the release archive and ensure ownership is `plotdirector:plotdirector`.
|
|
|
|
Stop `plotdirector-dev` before replacing the physical live directory.
|
|
|
|
Back up the existing `current` directory to the timestamped `current-before` path.
|
|
|
|
Use `rsync -a --delete` from the release directory into `current`, preserving:
|
|
|
|
- `appsettings*.json`
|
|
- `.env*`
|
|
- `App_Data/`
|
|
- `wwwroot/uploads/`
|
|
- `uploads/`
|
|
- `logs/`
|
|
- `Logs/`
|
|
|
|
Restore `plotdirector:plotdirector` ownership and start `plotdirector-dev`.
|
|
|
|
If installation or startup fails, stop and diagnose. Do not continue blindly or claim successful deployment.
|
|
|
|
An application rollback does not undo SQL migrations and must remain compatible with the migrated schema.
|
|
|
|
## Verification
|
|
|
|
Verify:
|
|
|
|
- `systemctl is-active plotdirector-dev`
|
|
- service status and recent warning/error logs;
|
|
- local GET to `http://127.0.0.1:5050/`;
|
|
- public HTTPS GET to `https://dev.plotdirector.com/`;
|
|
- deployed `PlotLine.dll` metadata;
|
|
- SHA-256 of published and deployed `PlotLine.dll`;
|
|
- the changed authenticated route when applicable.
|
|
|
|
Timestamps alone do not prove the intended build is running.
|
|
|
|
Use a real GET for public smoke testing. HEAD may return 405.
|
|
|
|
Normal verification must validate TLS. Use `-k` only for certificate diagnosis.
|
|
|
|
Review configuration changes separately because deployment preserves deployed appsettings files.
|
|
|
|
Keep the release directory and `current-before` backup named with the deployed short SHA and UTC timestamp for traceability.
|