# PlotDirector # Phase 5 -- Multi-User, Collaboration & Subscription Architecture Version: 1.0\ Status: Approved Architecture Document\ Date: June 2026 ## Purpose Phase 5 introduces multi-user support, subscriptions, collaboration capabilities, storage management, auditing, and monetisation foundations to PlotDirector. The goal is to transform PlotDirector from a single-user authoring platform into a secure SaaS application while preserving its core philosophy as a planning and writing workspace for authors. ## Core Principles - PlotDirector is an active workspace, not a permanent archive. - Security takes precedence over convenience. - Collaboration supports planning, not real-time writing. - Subscription limits should be generous but prevent abuse. ## Definitions ### User Authenticated account holder within PlotDirector. ### Project Highest-level container which may represent a standalone book or an entire series. ### Book A single book within a project. Subscription limits are enforced against books. ### Owner The user who created a project and manages collaborators. ### Collaborator A user granted edit access to another user's project. ### Subscription Defines usage limits and capabilities. ## Security Architecture Project access shall be determined through ProjectUserAccess records. Access checks must answer: > Can this user access this project? Not: > Does this user own this project? ### Access Roles #### Owner - Full project access - Invite/remove collaborators - Delete projects - Export projects #### Collaborator - View projects - Edit projects Restrictions: - Cannot delete projects - Cannot invite collaborators - Cannot transfer ownership - Cannot manage subscriptions Viewer-only access is explicitly excluded from Phase 5. ### ProjectUserAccess Fields: - ProjectUserAccessID - ProjectID - UserID - AccessRole - InvitedByUserID - InvitedDateUTC - AcceptedDateUTC - IsActive All project-scoped operations must validate user access. Protected areas include: - Projects - Books - Chapters - Scenes - Timeline - Characters - Assets - Locations - Plot Lines - Relationships - Workspace - Imports - Exports - Attachments ## Subscription Levels ### Draft Desk - Books: 2 - Chapters per Book: 75 - Scenes per Book: 300 - Characters per Project: 75 - Storage: 100 MB - Collaborators: 0 ### Writing Room - Books: 10 - Chapters per Book: 150 - Scenes per Book: 1000 - Characters per Project: 250 - Storage: 1 GB - Collaborators: 1 ### Story Forge - Books: 30 - Chapters per Book: 200 - Scenes per Book: 2000 - Characters per Project: 500 - Storage: 5 GB - Collaborators: 3 ### Author Studio - Books: Practical unlimited - Chapters: Practical unlimited - Scenes: Practical unlimited - Characters: Practical unlimited - Storage: 20 GB - Collaborators: 10 ## Collaboration Requirements Supported: - Invite collaborators - Remove collaborators - View collaborator lists Excluded: - Real-time editing - Internal messaging - Viewer-only roles - Conflict resolution - Ownership transfer ## Audit Requirements Major entities should support: - CreatedByUserID - CreatedDateUTC - ModifiedByUserID - ModifiedDateUTC Track activity for: - Projects - Books - Chapters - Scenes - Characters - Assets - Locations - Plot Lines - Relationships The audit system should answer: > Who changed what and when? ## Storage Management - Storage tracked per user - Limits enforced by subscription - Restrict file types - Resize uploaded images - Convert images to WebP - Remove unnecessary metadata Timeline and planning interfaces should remain fast and primarily text-based. ## Export and Archiving Projects should support export including: - Project data - Images - Attachments Archive workflow: 1. Export project 2. Offer download 3. Remove from active workspace ## Payment Integration Stripe will be introduced only after: - Security is complete - Subscription infrastructure exists - Limit enforcement is operational ## Phase 5 Implementation Order 1. Phase 5A -- Project Ownership & Security 2. Phase 5B -- Subscription Infrastructure 3. Phase 5C -- Subscription Limit Enforcement 4. Phase 5D -- Collaboration Foundation 5. Phase 5E -- Audit History & Activity Tracking 6. Phase 5F -- Storage Management 7. Phase 5G -- Export & Archiving 8. Phase 5H -- Subscription Management UI 9. Phase 5I -- Stripe Payment Integration ## Out of Scope - Real-time collaborative editing - Internal messaging systems - Viewer-only roles - AI collaboration workflows - Team organisations - Ownership transfer - Conflict resolution systems ## Success Criteria Phase 5 is complete when: - Project access is secure - Subscription limits are enforced - Collaboration functions safely - Audit history is available - Storage limits are operational - Projects can be exported and archived - Payment processing is integrated successfully