Record Phase 2 preflight and SQL administrative authentication blocker

This commit is contained in:
Nick Beckley 2026-11-25 15:39:14 +00:00
parent 4182dbdf5d
commit 3a6aa34ee4
3 changed files with 131 additions and 1 deletions

View File

@ -17,7 +17,7 @@ Read this document only when the current task requires database inspection, SQL
- `/sql/mssql` on the host maps to `/var/opt/mssql` in the container.
- Host `sqlcmd` is not installed.
- Container sqlcmd: `/opt/mssql-tools18/bin/sqlcmd`.
- Production is separate: host `www`, `192.168.10.8`, database `PlotLine`. Development authorisation does not authorise production changes.
- Production migration target: `web1`, `85.190.124.132`, database `PlotLine`. Initial deployment is [blocked pending SQL administrative authentication](../Deployment/Phase2-20261125.md). Historical server `www`, `192.168.10.8`, is inactive and retained for recovery. Development authorisation does not authorise production changes.
Never print, copy or commit connection strings, passwords, API keys, SMTP secrets, Stripe secrets or OpenAI keys.

View File

@ -0,0 +1,61 @@
{
"status": "blocked-before-provisioning",
"checked_utc": "2026-11-25T15:38:24Z",
"production_changes_performed": false,
"application_rebuilt_or_repackaged": false,
"qualified_source_commit": "190c074d5202fdf8a94b3b7a70c94857f848aafd",
"qualified_dll_sha256": "70c516e0a112c4e61813e563405c979ad35069539ddc440bddbd6dac0a4379d1",
"package_sha256": "0ec47c0c0e5ba17c0df34ce27105e183820947fd91bc466d276d305bf4cd10b9",
"signature_verified": true,
"public_key_matches_retained_private_authority_and_phase1_fingerprint": true,
"original_backup_sha256_verified": "6cf9e6d4d340a222a48c43265582e45a0150b132ae6eeb2bb6cd112f97cb743c",
"dns": {
"apex_A": [
"85.190.124.132"
],
"www_CNAME": "plotdirector.com",
"www_effective_A": [
"85.190.124.132"
],
"apex_AAAA": [],
"www_effective_AAAA": []
},
"catherine": {
"service": "active",
"pid": 13134,
"public_https_status_after_redirect": 200,
"tls_verification": "passed"
},
"web1": {
"hostname": "web1",
"sql_version": "17.0.5065.9",
"sql_service": "active",
"backup_timer": "active",
"last_backup_service_result": "success",
"last_backup_service_exit": 0,
"dotnet_runtime": "10.0.15",
"aspnet_runtime": "10.0.15",
"root_available_gib_approx": 554,
"available_memory_mib": 22120,
"loopback_5001_free": true,
"loopback_5003_free": true
},
"available_sql_principal": {
"name": "SqlBackupService",
"database": "PlotLine",
"sysadmin": false,
"securityadmin": false,
"control_server": false,
"alter_any_login": false,
"control_database": false,
"select_database": false,
"view_definition": false,
"alter_any_user": false,
"db_backupoperator": true
},
"live_database_baseline_verified": false,
"blocker": "No available documented SQL administrative authentication for security provisioning and live schema/business-data verification. Linux administrator sudo does not supply SQL authentication. No credentials reset or backup-account elevation attempted.",
"public_plotdirector_https": "Failed normal TLS validation: certificate hostname mismatch; no valid PlotDirector certificate issued or application activated.",
"activation_started": false,
"provisioning_started": false
}

View File

@ -0,0 +1,69 @@
# Production migration Phase 2 — 25 November 2026
**BLOCKED before provisioning: SQL administrative authentication unavailable.**
PlotDirector is not deployed or publicly available with valid HTTPS. No web1 or
www configuration, account, database, service, certificate or firewall changes were
performed. No package transfer, migration or activation was attempted.
## Completed focused preflight
- Existing strict administrator SSH access and sudo work; hostname is web1.
- Exact signed Phase 1 package verified. The public key matches both the retained
private signing authority and the committed Phase 1 public-key fingerprint.
Qualified PlotLine.dll matches `70c516e0a112c4e61813e563405c979ad35069539ddc440bddbd6dac0a4379d1`.
Nothing was rebuilt, repackaged or requalified.
- Original recovered backup SHA-256 matches the approved value. Backup media remain
untouched. Native SQL 17.0.5065.9 and Nginx are active. The existing SQL backup
timer is active and its last service run succeeded, exit 0.
- .NET/ASP.NET runtimes are 10.0.15; about 554 GiB disk and 22120 MiB memory were
available. Ports 5001 and 5003 are free; Catherine remains on loopback 5002.
- Apex A resolves to 85.190.124.132; www aliases the apex and resolves identically.
Neither hostname has an effective AAAA record. No DNS changes were made.
- Catherine remains active at PID 13134; normal public HTTPS, following its
redirect, returns 200 with successful TLS verification.
- PlotDirector normal public HTTPS currently fails certificate hostname validation.
No certificate request was made; certificate issuance must accompany the resumed
provisioning. TLS verification was not disabled.
[Sanitized preflight evidence](Evidence/Phase2-20261125/preflight.json).
## Exact blocker and prerequisite
The only available documented SQL credential is the root-protected hourly backup
credential, authenticating as `SqlBackupService`. Effective SQL checks show
`db_backupoperator=1`, but no sysadmin/securityadmin, CONTROL SERVER, ALTER ANY
LOGIN, database CONTROL, database SELECT, VIEW DEFINITION or ALTER ANY USER.
It cannot establish the live schema/business baseline, inspect all security
mappings, or provision the required runtime/migration logins and users. A matching
original backup does not prove that the live database remains unchanged.
An existing web1 SQL administrative credential must be made available securely,
or an authorised DBA must provide the equivalent administrative session. It must
support the reviewed login/user/role setup and security inventory, including the
migration login's direct CREATE ANY DATABASE permission. Do not send a password
in chat, put it in command arguments, reset sa, grant sysadmin/dbcreator to a new
application account, or elevate/reuse the backup credential. A root-only temporary
credential file on web1 or an approved secret-management channel is suitable; it
must not become part of a package, deployment evidence or Git.
After that prerequisite is supplied, resume the already-authorised Phase 2 work:
verify live schema/business fingerprints, provision protected tooling/accounts and
runtime configuration, issue a new apex/www certificate using webroot-only Certbot,
transfer/validate/activate the exact existing package, and perform focused public
acceptance. Do not repeat Phase 1 or request deployment approval again.
## Incomplete work and operational state
Provisioning, SQL security setup, persistent-data recovery, Production configuration,
restricted SSH installation, new certificate/renewal setup, service/vhost setup,
pre-deployment backup, migrations, activation/history and public application
acceptance remain unstarted. Live account/entitlement inspection also requires SQL
access; Phase 1's expired-entitlement finding remains historical, not a fresh live
verification. No subscriptions, Stripe state or external worker settings changed.
The temporary Atlas administrator authorisation is retained because permanent
restricted access is not installed. No owner authenticated or physical Word tests
were performed. Existing uncommitted repository documents were preserved.
Preflight stopped at 15:38 UTC. No provisioning or activation duration exists
because neither was started; the 15-minute activation target was not entered.
Readiness is **blocked**, with the signed candidate and recovery assets preserved.